Feds assert river jurisdiction {mosimage} After discussing a potential violation from the U.S. Army Corps of Engineers over working in the Mad River without a federal permit, ...
Irene and post-flood work spreads knotweed throughout The Valley {mosimage} {mosimage} Invasive Japanese knotweed is popping up all along the Mad River watershed and in local farmers’ fields, thanks to Irene ...
Sugarbush snowmaking pond yields 45,000 cubic yards of topsoil, plus gravel Engineered to function as a catch basin in a flood event, the Sugarbush snowmaking pond did just that during Hurricane ...
Waitsfield moving gravel, restoring riverbanks The Mad River is awash with heavy equipment as town employees and contractors remove gravel in the wake of Hurricane ...
Act 250 hearings underway for True North—Fayston Members of the District 5 Environmental Commission took testimony on 3 of the 10 Act 250 review criteria for True ...
Act 250 hearings underway for True North—Fayston Members of the District 5 Environmental Commission took testimony on 3 of the 10 Act 250 review criteria for True North Wilderness ...